X
How do I get paid? Learn about our new Secured Funds Program!
  View site in English, Español, or Français
The fair-trade ticketing company.
Sign Me Up!  |  Log In
 
Find An Event Create Your Event Help
 
SPE-PB Completions and Operations Study Group
Midland Petroleum Club
Midland, TX
Share this event:
Registration Options
There are no active dates for this event.



Event

SPE-PB Completions and Operations Study Group
The Last Mile: Advanced Completion Technology for Extended Reach Laterals

Abstract:
Technological and operational improvements have made it possible to drill increasingly longer laterals.   At the same time that lateral lengths are increasing in the Permian Basin, frac intensities are also increasing, proppant loading continues an upward trend, and stage spacing is decreasing. All these factors continue to challenge completion technologies when completing extended reach laterals, especially at the toe stages.  Energen, one of the most active operators in the Permian Basin has solved this problem by consistently implementing sliding sleeve technology at the toe stages of its extended reach cemented liner wells.  Run in clusters of four or five sleeves, each stage at the toe of these extended reach wells benefits from the efficiency of ball-drop completions, combined with the placement accuracy of limited entry stimulation. In this presentation Energen will discuss some of the benefits they have experienced utilizing this system and Packers Plus will elaborate on the advancements in completion technology that have provided higher density stimulation for greater reservoir coverage in horizontal wellbores, while improving operations and mitigating risks that can lead to unplanned non-productive time, cost overruns and lost production.

Bio:
Travis Harris is the Product Line Manager, Cemented Systems, at Packers Plus Energy Services, Inc.

Over his 30 year career in the oil and gas sector, Mr. Harris has held a variety of operational and management roles, with a focus on new product launches. Prior to joining Packers Plus, he worked as a Technical Services Manager and an Operations Manager at large service companies, where he was responsible for all daily operations in a large district area that included cased hole completions, open hole completions, remedial and stimulation, thru tubing fishing and all big hole fishing operations. He also worked closely with operators and liaised with other services to ensure jobs were completed cohesively and successfully.

His present focus at Packers Plus is to develop and implement the company strategy for its innovative cemented systems that improve efficiency and save time and cost for operators.

Mr. Harris holds a Bachelor of Business Administration degree from Texas State University and holds a number of patents.

Location

Midland Petroleum Club (View)
501 W Wall St
Midland, TX 79701
United States

Categories

None

Kid Friendly: No
Dog Friendly: No
Non-Smoking: Yes!
Wheelchair Accessible: Yes!

Contact


Contact us
Email
support@brownpapertickets.com
Phone
1-800-838-3006 (Temporarily Unavailable)
Resources
Developers
Help
Ticket Buyers
Track Your Order
Browse Events
Locations
Event Producers
Create an Event
Pricing
Services
Buy Pre-Printed Tickets
The Venue List
Find out about local events
Get daily or weekly email notifications of new and discounted events in your neighborhood.
Sign up for local events
Connect with us
Follow us on Facebook
Follow us on Twitter
Follow us on Instagram
Watch us on YouTube
Get to know us
Use of this service is subject to the Terms of Usage, Privacy Policy, and Cookie Policy of Brown Paper Tickets. All rights reserved. © 2000-2022 Mobile EN ES FR